
01
Sun study of your plot
€450 · 7 days
- A visit to the plot at two times of day
- Shadows of the neighbours on 21 June and 21 December
- Hours of direct sun on each façade
- A first sketch: where the courtyard and the bedrooms go
Services and fees
Every one starts with the same thing: knowing where the sun falls on your plot. Fees are agreed in writing before we start, and paid by phase.

01
€450 · 7 days

02
9% of build cost

03
11% of build cost

04
from €3,500
Pick a day and an hour. The sun’s position over Córdoba comes from the NOAA equations, the same ones we use on every project.
Source: NOAA Global Monitoring Laboratory, Solar Calculator equations
Paid by phase: 10% sketch design, 30% planning, 20% construction drawings, 40% on site. VAT not included.
Shadows on both solstices, hours of sun per façade, a first sketch. Deducted if we do the project.
7 days
€450
From the first sketch to the last site visit: design, permit, construction drawings and site supervision.
2–3 years
9% of build cost
Existing and listed buildings, with the heritage survey and the permits they need.
1–2 years
11% of build cost
Flats, shops and studios: layout, joinery, materials and light.
3–6 months
from €3,500
Yes, anywhere in Andalusia for full projects, and anywhere at all for a sun study: we only need the address and the plans of the neighbouring buildings.
A drawing of your plot with the shadows of the buildings around it on 21 June and 21 December, and the hours of direct sun each façade gets. It tells you where the courtyard, the bedrooms and the windows should go before anyone draws a room.
Between two and three years from the first visit to the keys. About half of that is the council permit and the building work.
By phase: 10% with the sketch design, 30% with the planning drawings, 20% with the construction drawings and 40% spread over the months on site.
Of course. We’ll ask for two more quotes to compare, and we visit the site every week whoever builds it.
Most of our renovations are in the historic centre of Córdoba, a UNESCO World Heritage Site. We prepare the heritage survey and deal with the permits.
Tell us where it is. In seven days you’ll have the shadows on 21 June and 21 December and the hours of sun on each façade. €450, deducted if we do the project.